Scope of work on this project included power distribution. This included 12 main switchboards that feed smaller electrical panel boards throughout the facility. Vertical bus duct extend up through the building to provide power for the electrical rooms. Each of the electrical rooms include 120/208V and 277/480V power. There are three generators (two 750-kW and one 1000-kW) on site for emergency backup. Capital Electric Construction installed approximately 60 miles of conduit and 285 miles of wire in the two buildings combined, along with more than 10,000 light fixtures and 3,600 electrical devices.