The electrical scope of work included more than 65,400 lineal feet of red concrete-encased duct bank, more than a half million feet of polyvinyl chloride (PVC) conduit, more than 130 miles of electrical wire, five generators, 23 pad-mounted transformers, two main switchgear sources, 22 S&C sectionalizing equipment cabinets, 65 electric precast manholes, and 318 electric and communication precast hand holes.